The Permitting Company can provide site plans and maps to existing operators of permitted waste sites who are looking to change their site layout/infrastructure, or to operators who are looking to apply for a permit, and only require site plans and maps as a standalone service.

Our site plans and maps are to scale and UK grid reference specific for ultimate accuracy.

Site Location Plan

A site location is exactly what it sounds like, it shows the location of the site within the surrounding area. More importantly, it will show the permitted area of the waste operation.

This is usually a green boundary and is used by the Environment Agency to check distances from the site to sensitive receptors, but also to regulate your site within this boundary to ensure your operation is not being conducted outside of this area. Site location are required when applying for a permit application, but it can also be required if you are varying a permit to increase the permit boundary e.g. if you require more operational space due to expansions in your waste activity.

There are also instances where a new location plan is required if the existing boundary is not accurate and the regulator requests that the boundary be changed (although this is quite rare).

The Permitting Company Limited offer site location plans as a standalone service (or in combination with other plans and maps if required).

Sensitive Receptor Plans

Sensitive receptor plans are radius buffers from the permitted site which are usually 1km, 2km, or 5km. The radius will depend on the type of permit you are applying for.

The purpose of the receptor plan is to identify sensitive locations that could be impacted by your operation.

The types of pollution that can escape your site and affect the sensitive receptors could be noise & vibration, odour, particulate matter, fumes, bioaerosols, pests/vermin, litter, mud/debris, discharge and run off.

Sensitive receptors can include:

The layout of buildings

Protected sites and species

Anywhere used to grow food or to farm animals or fish

Drain and sewer systems

Factories and other businesses

Fields and allotments used to grow food

Footpaths

Groundwater beneath your site

Homes, or groups of homes (such as villages or housing developments)

Private drinking water supplies

Schools, hospitals and other public buildings

Areas of scientific interest

Roads, railways, bus stations, pylons (on or immediately adjacent to the site only), utilities, airports

Playing fields and playgrounds

Regionally important geological sites

Water, EG. ponds, streams, rivers, lakes or the sea

Protected habitats, watercourses, groundwater, boreholes, wells and springs supplying water for human consumption

Compass rose showing north and the prevailing wind direction.

Knowing what sensitive receptors there are in proximity to your site will enable you to implement measures to ensure you are protecting the surrounding environment and complying with the conditions of your permit.

The Permitting Company Limited offer sensitive receptor plans as a standalone service (or in combination with other plans and maps if required).

This is to establish the sensitive receptors within a certain proximity from the site (usually a 1km radius).

Site Infrastructure/Layout Plans

Site layout and infrastructure plans are required to demonstrate what protected features the site has within the permitted area.

This must be drawn to scale and include features such as:

 

Buildings, and other main constructions, like treatment plants, incinerators, storage silos and security fences

Storage facilities for hazardous materials like oil and fuel tanks, chemical stores, waste materials

Storage facilities for hazardous materials like oil and fuel tanks, chemical stores, waste materials

Location of items for use in accidents and emergencies, like absorbants for chemical spills

Entrances and exits that can be used by emergency services

Points designed to control pollution, for example inspection or monitoring points

Trade effluent or sewage effluent treatment plants

Effluent discharge points

Land that you believe is contaminated, for example areas of your site that have previously been used for industrial purposes

The location of discharge points to the sewer, watercourse or soakaway

The location of stop and diverter valves and interceptors

Gas and electric isolating valves and switches

All permanent ignition sources on your site and show they are a minimum of 6m away from combustible and flammable waste

All separation distances

Any area where crushing, shredding, baling, or other treatment of wase using fixed plant is occurring.

Access points around the site perimeter to assist firefighting

Hydrants and water supplies

Storage areas with pile dimensions and fire walls (where applicable) – this includes wastes stored in a building, bunker, or containers – include indicative pile layouts and ensure it is geographically representative

The location of fixed plant or where you store mobile plant when not in use

The direction of flow of the water in the drain

The location of manhole covers and drains

The mains water stop tap

The layout of buildings

Any areas where hazardous and flammable materials are stored on site (location of gas cylinders, process areas, chemicals, piles of combustible wastes, oil and fuel tanks)

Any areas where you are treating or storing combustible waste or combustible non-waste material

Any areas where you are storing combustible liquid wastes

Main access routes for fire engines and any alternative access

Areas of natural and unmade ground

Drainage runs, pollution control features such as drain closure valves, and fire water containment systems such as bunded or kerbed areas (this may be easier to show on a separate drainage plan)

The quarantine area

Anything site specific you consider needs to be added

In most instances, a layout plan will be required at the point of applying for an environmental permit, particularly if a fire prevention plan is required.

The layout plan should be revised throughout the lifetime of the site if anything changes e.g. dimensions of bays and changes in pollution prevention features such as drainage isolation valves.

The Permitting Company Limited offer site layout plans as a standalone service (or in combination with other plans and maps if required).

Our Services

The Permitting Company have a 100% success rate in getting Environmental Permits issued to operators. All we need is your time in explaining your proposed activity and we will take care of the rest.

There are different Competent Authorities which are responsible for regulating waste management facilities and issuing Environmental Permits. Depending on your location, following competent authority are:

Environment Agency (EA) England

Natural Resources Wales (NRW) Wales

Scottish Environment Protection Agency (SEPA) Scotland

The Permitting Company have worked with all the relevant Competent Authorities and understand the different application processes required to satisfy laws in each jurisdiction.

Please get in touch for a no obligation discussion

The Permitting Company are one of the most competitively priced permitting consultancies in United Kingdom. Because every site and application is unique, there are no standard prices when it comes to applications for Environmental Permits.